Back to the backflow review queue
Backflow assembly test: Golden Animal Hospital
ApprovedFiled May 2, 2025 by Drew Harlow, Summit Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- May 2, 2025
- Assembly type
- RP
- Serial number
- B728330
- Size
- 4
- Test gauge serial
- G-8013
- Gauge calibration date
- Jan 31, 2025
- Check valve 1
- 3.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.8 psid
- Relief valve opened at
- 2.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Drew Harlow, current on the service date
- All required fields present
- Address matches parcel 073-66-01297
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
4157 Laurel Trl
Owner: Nguyen Holdings LLC
Parcel 073-66-01297