Back to the backflow review queue
Backflow assembly test: 1922 Mill Creek Ln
ApprovedFiled Oct 2, 2025 by Drew Harlow, Summit Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Oct 2, 2025
- Assembly type
- DC
- Serial number
- K309481
- Size
- 1
- Test gauge serial
- G-2294
- Gauge calibration date
- Sep 21, 2024
- Check valve 1
- 0.6 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 2.3 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Drew Harlow, current on the service date
- All required fields present
- Address matches parcel 073-79-01257
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
1922 Mill Creek Ln
Owner: Riley Nguyen
Parcel 073-79-01257