Back to the backflow review queue
Backflow assembly test: 1463 Stone Gate Dr
ApprovedFiled Apr 16, 2025 by Jamie Harlow, Summit Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Apr 16, 2025
- Assembly type
- RP
- Serial number
- A408499
- Size
- 3/4
- Test gauge serial
- G-5168
- Gauge calibration date
- Jul 23, 2024
- Check valve 1
- 8.8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.2 psid
- Relief valve opened at
- 3 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Jamie Harlow, current on the service date
- All required fields present
- Address matches parcel 013-76-01119
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
1463 Stone Gate Dr
Owner: Emerson Calloway
Parcel 013-76-01119