Back to the backflow review queue

Backflow assembly test: Riverside Brewing Co

Approved

Filed Aug 25, 2025 by Hayden Danner, Northstar Plumbing & Backflow. Filed from a phone.

Report

Date of service
Aug 25, 2025
Assembly type
RP
Serial number
K760361
Size
2
Test gauge serial
G-9478
Gauge calibration date
Mar 9, 2025
Check valve 1
6.5 psid
Check valve 1 closed tight
Yes
Check valve 2
2.6 psid
Relief valve opened at
2.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Danner, current on the service date
  • All required fields present
  • Address matches parcel 013-16-01170
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

980 Turkey Hill Trl
Owner: Danner Holdings LLC
Parcel 013-16-01170