Back to the backflow review queue

Backflow assembly test: 8594 Cedar Hollow Ct

Approved

Filed Jun 29, 2026 by Jamie Harlow, Summit Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 29, 2026
Assembly type
PVB
Serial number
Z893071
Size
3/4
Test gauge serial
G-6097
Gauge calibration date
Apr 21, 2026
Check valve 1
4.3 psid
Check valve 1 closed tight
Yes
Check valve 2
1.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Harlow, current on the service date
  • All required fields present
  • Address matches parcel 013-68-01130
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

8594 Cedar Hollow Ct
Owner: Drew Ashby
Parcel 013-68-01130