Back to the backflow review queue

Backflow assembly test: Golden Medical Offices

Approved

Filed Nov 8, 2025 by Jamie Harlow, Summit Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 8, 2025
Assembly type
RP
Serial number
B864595
Size
1
Test gauge serial
G-9269
Gauge calibration date
Oct 9, 2025
Check valve 1
4.4 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Relief valve opened at
3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Harlow, current on the service date
  • All required fields present
  • Address matches parcel 013-43-01269
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

3877 Stone Gate Ln
Owner: Benton Holdings LLC
Parcel 013-43-01269