Back to the backflow review queue

Backflow assembly test: 2659 Orchard Way

Approved

Filed Feb 19, 2024 by Morgan Calloway, Lakeside Plumbing & Backflow. Filed from a phone.

Report

Date of service
Feb 19, 2024
Assembly type
PVB
Serial number
B401290
Size
3/4
Test gauge serial
G-9024
Gauge calibration date
Jan 4, 2024
Check valve 1
3 psid
Check valve 1 closed tight
Yes
Check valve 2
2.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Calloway, current on the service date
  • All required fields present
  • Address matches parcel 019-10-01029
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2659 Orchard Way
Owner: Alex Ashby
Parcel 019-10-01029