Back to the backflow review queue

Backflow assembly test: 4967 Stone Gate Ct

Approved

Filed Apr 19, 2025 by Riley Kessler, Patriot Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Apr 19, 2025
Assembly type
RP
Serial number
Z344501
Size
3/4
Test gauge serial
G-4438
Gauge calibration date
Sep 12, 2024
Check valve 1
6.2 psid
Check valve 1 closed tight
Yes
Check valve 2
1.2 psid
Relief valve opened at
4.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Riley Kessler, current on the service date
  • All required fields present
  • Address matches parcel 019-78-01195
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

4967 Stone Gate Ct
Owner: Jamie Nguyen
Parcel 019-78-01195