Back to the backflow review queue

Backflow assembly test: 1891 Stone Gate Way

Approved

Filed Jan 29, 2025 by Morgan Calloway, Lakeside Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jan 29, 2025
Assembly type
RP
Serial number
A593375
Size
3/4
Test gauge serial
G-2135
Gauge calibration date
Sep 12, 2024
Check valve 1
4.7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.7 psid
Relief valve opened at
4.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Calloway, current on the service date
  • All required fields present
  • Address matches parcel 019-83-01044
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1891 Stone Gate Way
Owner: Parker Wexler
Parcel 019-83-01044