Back to the backflow review queue

Backflow assembly test: 2739 Pine Knoll Rd

Approved

Filed Nov 14, 2026 by Cameron Danner, Heritage Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 14, 2026
Assembly type
RP
Serial number
B677347
Size
3/4
Test gauge serial
G-8436
Gauge calibration date
Aug 7, 2026
Check valve 1
8.1 psid
Check valve 1 closed tight
Yes
Check valve 2
3.3 psid
Relief valve opened at
3.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Danner, current on the service date
  • All required fields present
  • Address matches parcel 021-80-01075
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2739 Pine Knoll Rd
Owner: Avery Whitcomb
Parcel 021-80-01075