Back to the backflow review queue

Backflow assembly test: 9078 Turkey Hill Ct

Approved

Filed Mar 23, 2026 by Parker Danner, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Mar 23, 2026
Assembly type
PVB
Serial number
B870862
Size
1
Test gauge serial
G-1001
Gauge calibration date
Oct 11, 2025
Check valve 1
8.4 psid
Check valve 1 closed tight
Yes
Check valve 2
3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Danner, current on the service date
  • All required fields present
  • Address matches parcel 007-94-01316
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

9078 Turkey Hill Ct
Owner: Blake Ashby
Parcel 007-94-01316