Back to the backflow review queue

Backflow assembly test: Blue Heron Grill

Approved

Filed Dec 29, 2025 by Parker Danner, Valley Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Dec 29, 2025
Assembly type
RP
Serial number
W754061
Size
1 1/2
Test gauge serial
G-2557
Gauge calibration date
Apr 16, 2025
Check valve 1
5.5 psid
Check valve 1 closed tight
Yes
Check valve 2
2.8 psid
Relief valve opened at
2.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Danner, current on the service date
  • All required fields present
  • Address matches parcel 007-88-01160
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

6179 Quarry Way
Owner: Calloway Holdings LLC
Parcel 007-88-01160