Back to the backflow review queue
Backflow assembly test: Main Street Brewing Co
ApprovedFiled Sep 2, 2025 by Cameron Whitcomb, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Sep 2, 2025
- Assembly type
- DC
- Serial number
- W276794
- Size
- 1 1/2
- Test gauge serial
- G-6095
- Gauge calibration date
- May 15, 2025
- Check valve 1
- 4.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Cameron Whitcomb, current on the service date
- All required fields present
- Address matches parcel 045-46-01313
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
5978 Turkey Hill Way
Owner: Kessler Holdings LLC
Parcel 045-46-01313