Back to the backflow review queue
Backflow assembly test: Maple Leaf Medical Offices
ApprovedFiled Mar 27, 2025 by Parker Ashby, Northstar Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Mar 27, 2025
- Assembly type
- RP
- Serial number
- K505598
- Size
- 2
- Test gauge serial
- G-7474
- Gauge calibration date
- Dec 6, 2024
- Check valve 1
- 7.8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.2 psid
- Relief valve opened at
- 2.6 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Ashby, current on the service date
- All required fields present
- Address matches parcel 131-43-01061
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
3846 Quarry Dr
Owner: Danner Holdings LLC
Parcel 131-43-01061