Back to the backflow review queue
Backflow assembly test: Blue Heron Diner
ApprovedFiled Oct 9, 2026 by Alex Benton, Heritage Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Oct 9, 2026
- Assembly type
- RP
- Serial number
- A364921
- Size
- 1
- Test gauge serial
- G-7548
- Gauge calibration date
- Mar 22, 2026
- Check valve 1
- 0.5 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 3.1 psid
- Relief valve opened at
- 2.2 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Alex Benton, current on the service date
- All required fields present
- Address matches parcel 001-25-01197
- Readings in range, no flags
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
4009 Old Church Dr
Owner: Danner Holdings LLC
Parcel 001-25-01197