Back to the backflow review queue
Backflow assembly test: Golden Dental
ApprovedFiled Jan 4, 2026 by Alex Benton, Heritage Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jan 4, 2026
- Assembly type
- RP
- Serial number
- B703361
- Size
- 1 1/2
- Test gauge serial
- G-5449
- Gauge calibration date
- Aug 12, 2025
- Check valve 1
- 5.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.9 psid
- Relief valve opened at
- 3.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Alex Benton, current on the service date
- All required fields present
- Address matches parcel 001-19-01319
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
8963 Cedar Hollow Rd
Owner: Fairley Holdings LLC
Parcel 001-19-01319