Back to the backflow review queue

Backflow assembly test: 6219 Turkey Hill Trl

Approved

Filed Jan 6, 2026 by Morgan Vance, Patriot Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Jan 6, 2026
Assembly type
RP
Serial number
A576243
Size
3/4
Test gauge serial
G-6039
Gauge calibration date
Sep 3, 2025
Check valve 1
4 psid
Check valve 1 closed tight
Yes
Check valve 2
3.8 psid
Relief valve opened at
3.7 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Vance, current on the service date
  • All required fields present
  • Address matches parcel 013-93-01144
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

6219 Turkey Hill Trl
Owner: Logan Lindqvist
Parcel 013-93-01144