Back to the backflow review queue

Backflow assembly test: Blue Heron Bakery

Approved

Filed Jul 23, 2026 by Morgan Vance, Patriot Backflow Testing. Filed from a phone.

Report

Date of service
Jul 23, 2026
Assembly type
DC
Serial number
W176845
Size
4
Test gauge serial
G-2782
Gauge calibration date
Apr 16, 2026
Check valve 1
7.1 psid
Check valve 1 closed tight
Yes
Check valve 2
3.3 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Vance, current on the service date
  • All required fields present
  • Address matches parcel 013-51-01331
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

6595 Quarry Ct
Owner: Ellery Holdings LLC
Parcel 013-51-01331