Back to the backflow review queue

Backflow assembly test: Maple Leaf Taqueria

Approved

Filed Sep 29, 2024 by Logan Fairley, Valley Plumbing & Backflow. Filed from a phone.

Report

Date of service
Sep 29, 2024
Assembly type
RP
Serial number
B896044
Size
1 1/2
Test gauge serial
G-2926
Gauge calibration date
Aug 24, 2024
Check valve 1
3.2 psid
Check valve 1 closed tight
Yes
Check valve 2
1.8 psid
Relief valve opened at
4.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Logan Fairley, current on the service date
  • All required fields present
  • Address matches parcel 017-27-01287
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1040 Stone Gate Trl
Owner: Stroud Holdings LLC
Parcel 017-27-01287