Back to the backflow review queue

Backflow assembly test: Maple Leaf Taqueria

Approved

Filed Oct 19, 2026 by Avery Ashby, Summit Backflow Testing. Filed from a phone.

Report

Date of service
Oct 19, 2026
Assembly type
RP
Serial number
B896044
Size
1 1/2
Test gauge serial
G-6112
Gauge calibration date
Jul 7, 2026
Check valve 1
4.9 psid
Check valve 1 closed tight
Yes
Check valve 2
3.7 psid
Relief valve opened at
4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Avery Ashby, current on the service date
  • All required fields present
  • Address matches parcel 017-27-01287
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

1040 Stone Gate Trl
Owner: Stroud Holdings LLC
Parcel 017-27-01287