Back to the backflow review queue

Backflow assembly test: 6735 Mill Creek Rd

Approved

Filed Apr 7, 2026 by Avery Ashby, Summit Backflow Testing. Filed from a phone.

Report

Date of service
Apr 7, 2026
Assembly type
RP
Serial number
A613563
Size
1
Test gauge serial
G-4595
Gauge calibration date
Mar 3, 2026
Check valve 1
6.9 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Relief valve opened at
2.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Avery Ashby, current on the service date
  • All required fields present
  • Address matches parcel 017-38-01063
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

6735 Mill Creek Rd
Owner: Shawn Calloway
Parcel 017-38-01063