Back to the backflow review queue

Backflow assembly test: 2885 Quarry Way

Approved

Filed Oct 20, 2024 by Riley Marsh, Valley Plumbing & Backflow. Filed from a phone.

Report

Date of service
Oct 20, 2024
Assembly type
DC
Serial number
A241312
Size
3/4
Test gauge serial
G-8142
Gauge calibration date
Oct 13, 2023
Check valve 1
0.1 psid
Check valve 1 closed tight
No
Check valve 2
1.1 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Riley Marsh, current on the service date
  • All required fields present
  • Address matches parcel 017-70-01077
  • Test gauge calibration is more than a year old.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2885 Quarry Way
Owner: Parker Fairley
Parcel 017-70-01077