Back to the backflow review queue

Backflow assembly test: Main Street Grill

Approved

Filed May 9, 2026 by Parker Stroud, Valley Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
May 9, 2026
Assembly type
DC
Serial number
A983966
Size
1 1/2
Test gauge serial
G-5289
Gauge calibration date
Feb 8, 2026
Check valve 1
7.7 psid
Check valve 1 closed tight
Yes
Check valve 2
2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Stroud, current on the service date
  • All required fields present
  • Address matches parcel 017-64-01047
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

5733 Ridgeview Way
Owner: Benton Holdings LLC
Parcel 017-64-01047