Back to the backflow review queue
Backflow assembly test: 9119 Cedar Hollow Trl
ApprovedFiled Nov 16, 2026 by Parker Benton, Keystone Backflow Testing. Filed from a phone.
Report
- Date of service
- Nov 16, 2026
- Assembly type
- PVB
- Serial number
- W134809
- Size
- 3/4
- Test gauge serial
- G-5218
- Gauge calibration date
- Mar 1, 2026
- Check valve 1
- 8.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.3 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Benton, current on the service date
- All required fields present
- Address matches parcel 025-42-01208
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
9119 Cedar Hollow Trl
Owner: Riley Danner
Parcel 025-42-01208