Back to the backflow review queue
Backflow assembly test: Golden Car Wash
ApprovedFiled Nov 8, 2026 by Reese Fairley, Keystone Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Nov 8, 2026
- Assembly type
- RP
- Serial number
- A317837
- Size
- 4
- Test gauge serial
- G-7082
- Gauge calibration date
- Mar 25, 2026
- Check valve 1
- 8.7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.2 psid
- Relief valve opened at
- 3.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Reese Fairley, current on the service date
- All required fields present
- Address matches parcel 025-90-01277
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
6998 Stone Gate Trl
Owner: Nguyen Holdings LLC
Parcel 025-90-01277