Back to the septic review queue

Septic maintenance (pump-out): 9780 Stone Gate Ct

Approved

Filed Oct 30, 2019 by Parker Harlow, Summit Wastewater. Filed from a phone.

Report

Date of service
Oct 30, 2019
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Drainfield or mound
Gallons pumped
894 gal
Sludge depth
31 in
Scum depth
3 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
No
Drainfield or mound: no surfacing, soggy ground or odor
No
Disposal site
County treatment plant
Repair needed
Yes
Repair needed: describe
Distribution box settled
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Harlow, current on the service date
  • All required fields present
  • Address matches parcel 027-65-01098
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Unsecured lids are a safety hazard.
  • Surfacing, soggy ground or odor at the drainfield or mound.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

9780 Stone Gate Ct
Owner: Jamie Fairley
Parcel 027-65-01098