Back to the septic review queue
Septic maintenance (pump-out): 2118 Quarry Ln
ApprovedFiled Nov 8, 2021 by Avery Stroud, Heritage Wastewater. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Nov 8, 2021
- Tank size
- 1000 gal
- Compartments
- 2
- Parts this system has
- Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
- Gallons pumped
- 945 gal
- Sludge depth
- 14 in
- Scum depth
- 6 in
- Baffles in good condition
- Yes
- Effluent filter
- Replaced
- Lids and risers secure
- Yes
- Pump runs and the floats turn it on and off
- Yes
- Alarm tested and working
- Yes
- Drainfield or mound: no surfacing, soggy ground or odor
- Yes
- Disposal site
- Regional wastewater plant
- Repair needed
- No
- Photos
- 2 attached
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Stroud, current on the service date
- All required fields present
- Address matches parcel 035-26-01119
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
2118 Quarry Ln
Owner: Rowan Nguyen
Parcel 035-26-01119