Back to the backflow review queue

Backflow assembly test: 4902 Cedar Hollow Ln

Approved

Filed Sep 21, 2025 by Parker Whitcomb, Ridge Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Sep 21, 2025
Assembly type
PVB
Serial number
K579735
Size
3/4
Test gauge serial
G-9551
Gauge calibration date
Apr 24, 2025
Check valve 1
7.3 psid
Check valve 1 closed tight
Yes
Check valve 2
2.2 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Whitcomb, current on the service date
  • All required fields present
  • Address matches parcel 037-57-01341
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

4902 Cedar Hollow Ln
Owner: Quinn Wexler
Parcel 037-57-01341