Back to the backflow review queue

Backflow assembly test: Blue Heron Grill

Approved

Filed Aug 28, 2026 by Parker Vance, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Aug 28, 2026
Assembly type
RP
Serial number
K507066
Size
1
Test gauge serial
G-7080
Gauge calibration date
Mar 13, 2026
Check valve 1
3.8 psid
Check valve 1 closed tight
Yes
Check valve 2
2.3 psid
Relief valve opened at
3.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Vance, current on the service date
  • All required fields present
  • Address matches parcel 037-66-01115
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

743 Cedar Hollow Ln
Owner: Ellery Holdings LLC
Parcel 037-66-01115