Back to the septic review queue
Septic maintenance (pump-out): 4195 Hickory Dr
ApprovedFiled Sep 22, 2023 by Cameron Kessler, Evergreen Wastewater. Filed from a phone.
Report
- Date of service
- Sep 22, 2023
- Tank size
- 1000 gal
- Compartments
- 1
- Parts this system has
- Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
- Gallons pumped
- 1048 gal
- Sludge depth
- 31 in
- Scum depth
- 4 in
- Baffles in good condition
- No
- Effluent filter
- Cleaned
- Lids and risers secure
- Yes
- Pump runs and the floats turn it on and off
- No
- Alarm tested and working
- Yes
- Drainfield or mound: no surfacing, soggy ground or odor
- Yes
- Disposal site
- Regional wastewater plant
- Repair needed
- No
- Photos
- None
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Cameron Kessler, current on the service date
- All required fields present
- Address matches parcel 041-31-01042
- Sludge is over a third of a typical tank depth; check for system failure.
- Baffles reported damaged; county may require repair.
- Pump or floats reported not working.
- No photos attached.
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
4195 Hickory Dr
Owner: Riley Fairley
Parcel 041-31-01042