Back to the backflow review queue
Backflow assembly test: 2866 Orchard Dr
ApprovedFiled May 15, 2024 by Casey Fairley, Heritage Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- May 15, 2024
- Assembly type
- RP
- Serial number
- Z875001
- Size
- 1
- Test gauge serial
- G-9144
- Gauge calibration date
- Sep 10, 2023
- Check valve 1
- 8.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.6 psid
- Relief valve opened at
- 4.1 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Casey Fairley, current on the service date
- All required fields present
- Address matches parcel 041-71-01036
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
2866 Orchard Dr
Owner: Blake Danner
Parcel 041-71-01036