Back to the backflow review queue

Backflow assembly test: Corner Bakery

Approved

Filed Feb 10, 2026 by Parker Ashby, Valley Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Feb 10, 2026
Assembly type
RP
Serial number
K383396
Size
1
Test gauge serial
G-1883
Gauge calibration date
Aug 20, 2025
Check valve 1
7.5 psid
Check valve 1 closed tight
Yes
Check valve 2
3.9 psid
Relief valve opened at
4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Ashby, current on the service date
  • All required fields present
  • Address matches parcel 041-56-01339
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

7181 Orchard Way
Owner: Wexler Holdings LLC
Parcel 041-56-01339