Back to the backflow review queue
Backflow assembly test: Corner Bakery
ApprovedFiled Mar 19, 2026 by Parker Fairley, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Mar 19, 2026
- Assembly type
- DC
- Serial number
- B159085
- Size
- 1
- Test gauge serial
- G-5846
- Gauge calibration date
- Aug 15, 2025
- Check valve 1
- 5.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Fairley, current on the service date
- All required fields present
- Address matches parcel 053-94-01080
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
756 Orchard Way
Owner: Wexler Holdings LLC
Parcel 053-94-01080