Back to the backflow review queue

Backflow assembly test: 3061 Stone Gate Way

Approved

Filed Jun 23, 2025 by Cameron Kessler, Summit Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 23, 2025
Assembly type
DC
Serial number
W954783
Size
1
Test gauge serial
G-7606
Gauge calibration date
Oct 19, 2024
Check valve 1
3.3 psid
Check valve 1 closed tight
Yes
Check valve 2
3.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Kessler, current on the service date
  • All required fields present
  • Address matches parcel 053-44-01149
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

3061 Stone Gate Way
Owner: Rowan Okafor
Parcel 053-44-01149