Back to the backflow review queue
Backflow assembly test: Crossroads Taqueria
ApprovedFiled Jul 2, 2024 by Parker Fairley, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Jul 2, 2024
- Assembly type
- DC
- Serial number
- Z202169
- Size
- 2
- Test gauge serial
- G-6129
- Gauge calibration date
- Mar 2, 2024
- Check valve 1
- 5.5 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Fairley, current on the service date
- All required fields present
- Address matches parcel 053-93-01142
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
5419 Orchard Rd
Owner: Benton Holdings LLC
Parcel 053-93-01142