Back to the backflow review queue

Backflow assembly test: 2980 Cedar Hollow Way

Approved

Filed Oct 29, 2026 by Parker Pruitt, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Oct 29, 2026
Assembly type
RP
Serial number
K190720
Size
1
Test gauge serial
G-8029
Gauge calibration date
Sep 8, 2026
Check valve 1
6.7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Relief valve opened at
4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Pruitt, current on the service date
  • All required fields present
  • Address matches parcel 053-98-01195
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2980 Cedar Hollow Way
Owner: Avery Harlow
Parcel 053-98-01195