Back to the backflow review queue

Backflow assembly test: Station Self Storage

Approved

Filed Mar 1, 2025 by Hayden Fairley, Northstar Plumbing & Backflow. Filed from a phone.

Report

Date of service
Mar 1, 2025
Assembly type
RP
Serial number
K651457
Size
1 1/2
Test gauge serial
G-3250
Gauge calibration date
Jul 29, 2024
Check valve 1
5.9 psid
Check valve 1 closed tight
Yes
Check valve 2
3.8 psid
Relief valve opened at
3.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Fairley, current on the service date
  • All required fields present
  • Address matches parcel 055-20-01350
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2068 Stone Gate Ln
Owner: Stroud Holdings LLC
Parcel 055-20-01350