Back to the backflow review queue
Backflow assembly test: Station Grill
ApprovedFiled Aug 30, 2026 by Avery Ramirez, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Aug 30, 2026
- Assembly type
- RP
- Serial number
- W787526
- Size
- 1
- Test gauge serial
- G-6268
- Gauge calibration date
- Apr 9, 2026
- Check valve 1
- 4.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.3 psid
- Relief valve opened at
- 3.6 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Ramirez, current on the service date
- All required fields present
- Address matches parcel 059-64-01120
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
5952 Mill Creek Trl
Owner: Vance Holdings LLC
Parcel 059-64-01120