Back to the backflow review queue
Backflow assembly test: Blue Heron Taqueria
ApprovedFiled Oct 18, 2025 by Taylor Ashby, Valley Backflow Testing. Filed from a phone.
Report
- Date of service
- Oct 18, 2025
- Assembly type
- RP
- Serial number
- Z796636
- Size
- 1 1/2
- Test gauge serial
- G-3321
- Gauge calibration date
- Jul 23, 2025
- Check valve 1
- 7.5 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.2 psid
- Relief valve opened at
- 3.7 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Taylor Ashby, current on the service date
- All required fields present
- Address matches parcel 061-44-01319
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
2143 Old Church Ln
Owner: Marsh Holdings LLC
Parcel 061-44-01319