Back to the septic review queue

Septic maintenance (pump-out): 4250 Laurel Dr

Approved

Filed Jul 15, 2022 by Morgan Ellery, Summit Wastewater. Filed from a phone.

Report

Date of service
Jul 15, 2022
Tank size
1250 gal
Compartments
1
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
1217 gal
Sludge depth
11 in
Scum depth
7 in
Baffles in good condition
Yes
Effluent filter
Replaced
Lids and risers secure
Yes
Distribution box level, clear and undamaged
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Permitted land-application site
Repair needed
No
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Ellery, current on the service date
  • All required fields present
  • Address matches parcel 061-21-01271
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

4250 Laurel Dr
Owner: Rowan Brandt
Parcel 061-21-01271