Back to the septic review queue

Septic maintenance (pump-out): 4986 Stone Gate Dr

Approved

Filed May 1, 2023 by Morgan Ellery, Summit Wastewater. Read in from a paper form and confirmed by staff.

Report

Date of service
May 1, 2023
Tank size
1000 gal
Compartments
1
Parts this system has
Septic tank, Drainfield or mound
Gallons pumped
924 gal
Sludge depth
31 in
Scum depth
2 in
Baffles in good condition
Yes
Effluent filter
None present
Lids and risers secure
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
County treatment plant
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Ellery, current on the service date
  • All required fields present
  • Address matches parcel 061-50-01318
  • Sludge is over a third of a typical tank depth; check for system failure.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

4986 Stone Gate Dr
Owner: Shawn Ramirez
Parcel 061-50-01318