Back to the septic review queue
Septic maintenance (pump-out): 7195 Quarry Ct
Needs reviewFiled Nov 18, 2026 by Shawn Calloway, Keystone Wastewater. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Nov 18, 2026
- Tank size
- 750 gal
- Compartments
- 1
- Parts this system has
- Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
- Gallons pumped
- 719 gal
- Sludge depth
- 34 in
- Scum depth
- 8 in
- Baffles in good condition
- No
- Effluent filter
- None present
- Lids and risers secure
- No
- Pump runs and the floats turn it on and off
- Yes
- Alarm tested and working
- Yes
- Drainfield or mound: no surfacing, soggy ground or odor
- Yes
- Disposal site
- County treatment plant
- Repair needed
- No
- Photos
- None
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Shawn Calloway, current on the service date
- All required fields present
- Address matches parcel 065-79-01117
- Sludge is over a third of a typical tank depth; check for system failure.
- Baffles reported damaged; county may require repair.
- Unsecured lids are a safety hazard.
- No photos attached.
- Result: passing. Next due date resets when approved.
Decision
Property
7195 Quarry Ct
Owner: Sam Harlow
Parcel 065-79-01117