Back to the septic review queue

Septic maintenance (pump-out): 7195 Quarry Ct

Filed Nov 18, 2026 by Shawn Calloway, Keystone Wastewater. Read in from a paper form and confirmed by staff.

Report

Date of service
Nov 18, 2026
Tank size
750 gal
Compartments
1
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
719 gal
Sludge depth
34 in
Scum depth
8 in
Baffles in good condition
No
Effluent filter
None present
Lids and risers secure
No
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
County treatment plant
Repair needed
No
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Shawn Calloway, current on the service date
  • All required fields present
  • Address matches parcel 065-79-01117
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Unsecured lids are a safety hazard.
  • No photos attached.
  • Result: passing. Next due date resets when approved.

Decision

Property

7195 Quarry Ct
Owner: Sam Harlow
Parcel 065-79-01117