Back to the backflow review queue
Backflow assembly test: Maple Leaf Grill
ApprovedFiled May 27, 2025 by Blake Harlow, Evergreen Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- May 27, 2025
- Assembly type
- DC
- Serial number
- A997782
- Size
- 2
- Test gauge serial
- G-3424
- Gauge calibration date
- Dec 7, 2024
- Check valve 1
- 6.6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.7 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Blake Harlow, current on the service date
- All required fields present
- Address matches parcel 065-82-01359
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
6053 Stone Gate Trl
Owner: Ramirez Holdings LLC
Parcel 065-82-01359