Back to the septic review queue

Septic maintenance (pump-out): 2038 Old Church Way

Approved

Filed Jan 22, 2024 by Sam Lindqvist, Evergreen Pumping Co. Filed from a phone.

Report

Date of service
Jan 22, 2024
Tank size
1250 gal
Compartments
1
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
1088 gal
Sludge depth
28 in
Scum depth
5 in
Baffles in good condition
No
Effluent filter
Replaced
Lids and risers secure
Yes
Distribution box level, clear and undamaged
No
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Sam Lindqvist, current on the service date
  • All required fields present
  • Address matches parcel 067-93-01252
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Distribution box reported uneven, blocked or damaged.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2038 Old Church Way
Owner: Jordan Marsh
Parcel 067-93-01252