Back to the backflow review queue
Backflow assembly test: Station Dental
ApprovedFiled Sep 3, 2024 by Reese Danner, Keystone Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Sep 3, 2024
- Assembly type
- RP
- Serial number
- W349599
- Size
- 2
- Test gauge serial
- G-8945
- Gauge calibration date
- Apr 21, 2024
- Check valve 1
- 3.1 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3 psid
- Relief valve opened at
- 3.1 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Reese Danner, current on the service date
- All required fields present
- Address matches parcel 067-72-01196
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
178 Quarry Way
Owner: Lindqvist Holdings LLC
Parcel 067-72-01196