Back to the backflow review queue

Backflow assembly test: 1049 Cedar Hollow Ln

Approved

Filed Nov 25, 2025 by Reese Danner, Keystone Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 25, 2025
Assembly type
RP
Serial number
Z428764
Size
3/4
Test gauge serial
G-4690
Gauge calibration date
Oct 23, 2024
Check valve 1
0.8 psid
Check valve 1 closed tight
No
Check valve 2
2.2 psid
Relief valve opened at
2.7 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Reese Danner, current on the service date
  • All required fields present
  • Address matches parcel 067-90-01237
  • Test gauge calibration is more than a year old.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

1049 Cedar Hollow Ln
Owner: Riley Kessler
Parcel 067-90-01237