Back to the backflow review queue
Backflow assembly test: Blue Heron Grill
ApprovedFiled Feb 27, 2026 by Quinn Wexler, Lakeside Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Feb 27, 2026
- Assembly type
- DC
- Serial number
- B900469
- Size
- 1 1/2
- Test gauge serial
- G-2329
- Gauge calibration date
- Oct 13, 2025
- Check valve 1
- 6.6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Quinn Wexler, current on the service date
- All required fields present
- Address matches parcel 067-54-01310
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
1797 Stone Gate Dr
Owner: Harlow Holdings LLC
Parcel 067-54-01310