Back to the backflow review queue

Backflow assembly test: 2193 Pine Knoll Ln

Approved

Filed Mar 24, 2026 by Jordan Vance, Heritage Plumbing & Backflow. Filed from a phone.

Report

Date of service
Mar 24, 2026
Assembly type
DC
Serial number
Z113597
Size
1
Test gauge serial
G-9621
Gauge calibration date
Oct 15, 2025
Check valve 1
3.1 psid
Check valve 1 closed tight
Yes
Check valve 2
2.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jordan Vance, current on the service date
  • All required fields present
  • Address matches parcel 071-34-01078
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2193 Pine Knoll Ln
Owner: Jordan Hollins
Parcel 071-34-01078