Back to the backflow review queue
Backflow assembly test: Main Street Bakery
ApprovedFiled Apr 27, 2026 by Parker Fairley, Heritage Backflow Testing. Filed from a phone.
Report
- Date of service
- Apr 27, 2026
- Assembly type
- RP
- Serial number
- W838904
- Size
- 4
- Test gauge serial
- G-2710
- Gauge calibration date
- Sep 16, 2025
- Check valve 1
- 5.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.7 psid
- Relief valve opened at
- 4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Fairley, current on the service date
- All required fields present
- Address matches parcel 073-74-01068
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
4159 Sycamore Way
Owner: Ellery Holdings LLC
Parcel 073-74-01068