Back to the stormwater review queue

Stormwater facility inspection: Riverside Medical Offices

Approved

Filed Sep 7, 2026 by Drew Harlow, Evergreen Engineering. Filed from a phone.

Report

Date of service
Sep 7, 2026
Facility type
Bioretention
Sediment accumulation
31 % of capacity
Inlet and outlet clear
Yes
Erosion or embankment damage
No
Vegetation maintained
Yes
Functioning as designed
Yes
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Harlow, current on the service date
  • All required fields present
  • Address matches parcel 073-59-01085
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5693 Cedar Hollow Way
Owner: Hollins Holdings LLC
Parcel 073-59-01085